GRB System™

GRB System™
GRB System
An innovative construction system that applies the press-in principle.

GRB System achieves temporary work free construction

In the GRB System, all processes of press-in construction, including pile transportation, pitching, and pressing in, can be completed from on top of the piles, which completely eliminates the need for temporary works, such as temporary staging piers and roads, to enable temporary work free construction. In any situation, whether on water, sloping land, beside trains while in operation, or beside roads, work can be completed in the compact space required for the machine itself mounted on the piles. This system reduces the construction period and construction costs, while also dramatically reducing CO2 emissions.

Under bridges

On slopes

For more information, visit our website : GRB System