Gyropress Method™

Gyropress Method™
Gyropress Method
Tubular piles with ring bits and Rotary cutting function

No need to remove existing structures

The Gyropress Method provides a tubular pile installation while keeping the existing structure and underground obstacles in place by rotating and pressing tubular piles with ring bits at their toes into the ground. This enables The Gyropress Method is a rotary cutting press-in method for tube piles with ring bits, which enables quick reinforcement of structures as well as construction of new structures.

For more information, visit our website : Gyropress Method