The factory responds to developing, prototyping, and verifying large-scale products, which have become the leading products in recent years. (Building area: 3,516 m2)
For the first time in Japan, the tubular pile rotary cutting press-in method “Gyropress Method™” was adopted for the foundation of the buildings, and 54 tubular piles (pile length: 15.0 to 15.8 m) were installed.